Installation


 
1. Keep the panels in horizontal position during their storage to avoid the material bending. Unpack them 48 hours before their installation.
 
 
2. Measure the surface where the installation will be made and count the panels to cut.
 
 
3. Cut the panels on the back using a fretsaw with a special blade for fibre/polyester or use a radial saw with a diamond disc. When cutting try to keep the continuity.
 
 
4. Put the panel on the surface and drill with a 6mm bit. Always drill in the joints between the stones, never in the stones.
 

5. Fix the panels using screws with incorporated plugs. Each panel needs around 15 to 20 screws.

6. Prepare the Mastic: 1kg = 2% ACCELERATOR. Mix the ingredients.
 

7. Using a laurel shaped spatula, apply the mastic on the joints or in the bricks to rebuild them. Also hide the screw heads with the mastic.


8. With a brush no6 give the texture to the mastic with light touches (not brush strokes!). Remove the excess of mastic (clean continuously the brush with acetone).


9. Once the mastic is dried, paint with the colour, draining the brush in a rag to avoid dripping.

10. Paint the bricks and stones with the proper colours, according to each panel.

11. With the aim of integrating the colours perfectly, rub the surface lightly with a rag.